Concrete Project ROI Calculator

See How Much You'll Save With MudMixer

Plug in your numbers and instantly see your projected annual savings vs. traditional mixing methods.

Machine price: $3,695
Quick start:
$25
2 cu yd (90 bags)
2 workers
10 jobs
$200
$500
Additional Jobs / Month +8 More revenue capacity — same crew, same hours
Monthly Labor Savings $1,300
Payback Period 1.8 mo Paid off by Jul 2026 18 jobs to break even
Time Saved / Month 16.0 hrs
Total Monthly Savings $2,000 Labor + rental + ready-mix
You're already spending $700/month on workarounds. MudMixer pays for itself before your 2nd rental cycle.
Evolution
Add. jobs/mo +8
Labor savings $1,300
Payback 1.8 mo
Pro
Add. jobs/mo +44
Labor savings $1,467
Payback 2.8 mo
MudMixer price $3,695
Unlock +8 More Jobs / Month

* Pricing is shown in U.S. dollars (USD) and all calculations are based on United States market conditions only. Estimates are for informational purposes only and based on the inputs you provide. Actual savings will vary based on job conditions, crew experience, material costs, and regional labor rates. Calculations assume consistent daily output and do not account for downtime, maintenance, or material waste. Revenue projections assume recovered time is applied to additional billable work.

Pdf download
Model Evolution
Jobs Unlocked / Mo +8
Paid Off By
Total Savings / Mo $2,000
Get Mine →
texture top texture bottom

Stop Leaving Money on the Table

Join thousands of contractors who cut labor costs and doubled their output with MudMixer.

Calculate the ROI of Your Concrete Projects

This concrete project calculator takes your project details and shows what each mixing method costs you in labor, rental, and ready-mix fees, then shows how fast a MudMixer pays that back. Enter six numbers and the tool does the rest:

  • Your hourly labor rate per worker
  • Average job size in cubic yards or bags
  • Crew size for mixing
  • Jobs per month
  • Current mixer rental cost
  • Concrete truck minimum fees you absorb

From there you get an accurate estimate of your monthly savings, your payback period, and how many extra jobs you can run on the same crew. Run the numbers for one project type, then switch the quick-start tabs to compare a fence post job against a slab pour or a commercial job.

Here is where the money goes, & where a MudMixer wins it back

Savings By Project Type

Fence Posts

A standard residential fence post takes about one bag of fast-setting mix, so a long run of holes turns into a full day of hand mixing, while a MudMixer pours each footing in a continuous line and keeps the crew setting posts.

Footers

Most residential footers land in the 1-to-4 cubic yard dead zone, too much to hand-mix and too little for a ready mix truck minimum, so mixing on site pours them at full strength with no surcharge or leftover yardage.

Foundations

A foundation sets the structural base, so it has to reach full strength on schedule, and a MudMixer feeds a steady, consistent mix into the forms without waiting on a truck or risking a cold joint between batches.

Slabs

A concrete slab is the most common flat pour, running 4 to 6 inches thick depending on load and code, and a MudMixer keeps the supply moving so you place and finish a patio, driveway, or garage floor before the first batch sets up.

Decks / Patios

A small patio and a handful of deck footings rarely add up to a truck-worthy load, so a MudMixer gives you ready-mix consistency on an outdoor slab without the truck and without mixing forty bags by hand.

Commercial Use

Commercial pours run on volume and a clock, and the MudMixer Pro pushes over 3 cubic yards per hour of continuous output so the crew places concrete instead of waiting on the next truck.

Frequently Asked Questions